Skip to main content
Information
    Description
    NSPS Subparts OOOO, OOOOa and New Rules
    Who Should Attend
    Anyone interested in Oil and Gas.
    Leaning Objectives
    Overview of NSPS Subpart A - Determining Applicability - "New", "Modified", "Reconstructed"
    Applying these Subpart A provisions to NSPS Subpart OOOO and OOOOa applicability determinations NSPS Subpart OOOO and OOOOa Overview of Affected Facilities
    Compliance Schedule
    Well Requirements During Completions
    Compressor Requirements
    Pneumatic Controller Requirements
    Pneumatic Pump Requirements
    Storage Vessel Requirements (including emission calculation methods)
    Gas Plant Requirements
    Leak Detection and Repair (LDAR) Requirements for Well Sites and Compressor Stations
    Notification Requirements
    Annual Report Requirements
    Case Studies and Discussion

    Primary focus is applicability determinations for various scenarios.

    Pre-Requisites
    110 CenSARA (a), Introduction to Drilling Rig Operations.
    Dates
    -
    Instructor1
    Location Address

    900 SW JacksonSuite 560
    66612 KS
    United States

    Map Address
    Notes
    NSPS SubPart OOOO and New Rules Topic Covered: Overview of NSPS Subpart A – Determining Applicability – “New”, “Modified”, “Reconstructed” Applying these Subpart A provisions to NSPS Subpart OOOO applicability determinations NSPS Subpart OOOO – Final 2012 and 2013 Rules Background Overview of Affected Facilities Compliance Schedule Natural Gas Well Requirements During Completions Compressor Requirements Pneumatic Controller Requirements Storage Vessel Requirements (including emission calculation methods) Gas Plant Requirements Notification Requirements Annual Report Requirements Case Studies and Discussion Primary focus is applicability determinations for various scenarios.
    Classroom Hours
    6
    Class Capacity
    30